Showing posts with label Kaizen and coffee. Show all posts
Showing posts with label Kaizen and coffee. Show all posts

Friday, February 10, 2017

66. Leat at Origin Training in Kayanza, Burundi

Jan. 31 - Feb. 3, 2017
COCOCA is an umbrella organization of about 32 cooperatives in Burundi. Dusangirijambo is one of the most innovative and energetic among the group. The Dusangirijambo president is Rémége NZOBIRINDA.

They are a warm and friendly people, welcoming me on the day I arrived with an awesome performance by a drum & dance group! Some of the drummer/dancers were boys, maybe 12 years old. Very talented! And most of them, I was told, are coffee farmers.
Dusangirijambo organized a fantastic drum & dance performance for my welcome!

I enjoyed my week with this cooperative so much. The first day we scoped out how I would teach in their "reception building", the concrete block pavilion where farmers bring their cherry in bags to have them weighed, and then the bags are emptied into big, waiting concrete tanks. Fortunately, I had been warned there would be no electricity at this location, so I was not expecting to be able to use a powerpoint projector. I had printed key slides onto flipchart size paper and John (my husband) had rigged up a special hanger for the flipcharts that only required one, or if possible, two nails to hang!
One-room school house.

Leadership Training: The first two days were with the leadership of Dusangirijambo. The leadership training went well. We covered the concepts of Lean, like "Lean is not Mean", "flow" and the all-important, "9 wastes." The group enjoyed the practice exercises like "6S scoring" and an airplane production simulation.
Leadership Training, Jan. 31 & Feb. 1

Supervisor Training: The second two days were with the supervisor level and more of the workers. I gave a brief introduction to the key concepts, like the 9 wastes, and then we jumped into preparing to implement their first KAIZEN. Most of the second day was spent in their teams, working on the following three projects:
Team 1. Increase space on drying tables for coffee by 10%
Team 2. Increase skill of management of the drying tables (this area has the most employees)
Team 3. Double the space where the dry coffee is stored (warehouse).
Supervisor Training, Feb. 2 & 3

Results of KAIZEN events
The results of these "first time" KAIZEN projects were modest. Despite my over-emphasis and constant reminders that KAIZEN is about action, not talk, it is not easy to break through the cultural barriers of "who does which work." And, unfortunately, we really did not have much time. They had about 2 hours instead of a full day to work on implementation.

For example, team 1, tasked with increasing capacity of the tables, recommended a place where 70 more tables should be built. All around us on this day there were teams of builders re-building the current drying tables and these workers had been hired to do that job. So it just felt too strange to my Lean class members to start doing the same job these others were being paid to do, right along side them.

But, in this case, there was also a break-through moment. A senior leader said, "what if we just make sure we remove the coffee from the tables at exactly the right time?" It was brilliant! Everyone agreed and suddenly everyone was understanding what we meant about improving the "flow" of material. It was agreed that the cooperative would save about 700,000 BUF (the cost of 70 tables, about $440) if the improved timing worked as well as they hoped.

Team 2 did an excellent job discussing the metrics that a manager of the drying table staff could implement to monitor and control capacity and quality.

Team 3 made a checklist for the area (a big improvement) and included concepts of safety (one of the 9 wastes) and straightening (one of the 6S areas). Overall, though they were  too much "thinking in the box," though, proposing to raise the roof of the warehouse 8 meters to make more space at a cost of 10 million BUF (~ $7,000). When I reminded them, "there's no budget", then a breakthrough idea came! "Maybe we could have the trucks come to pick up the coffee more frequently. We own the trucks, so it is not very expensive." It was a "eureka!" moment.

Most of them understood how important this lean concept was, of keeping the flow going, eliminating the "waste" of stoppage and waiting. But to drive it home I said, "how many would like to have 10 million BUF more in the cooperative budget when it comes time to pay bonuses at the end of the season?" Everyone raised their hand with enthusiasm! I believe we then had 100% comprehension of why the cooperative should implement Lean.

KAIZEN Team 1 - Increase space on drying tables by 10%.

KAIZEN Team 2 - Increase skills of management of drying tables area.

KAIZEN Team 3: Double the space where the coffee will be stored.

Ruth and Jean Bosco NKURIKIYE (translator) co-teaching
Class in session.




Monday, April 20, 2015

20. Day 1 of 3: Can Lean Tools Work in Coffee?

Apr. 20, 2015 -- West Chester, Ohio (near Cincinnati, OH)

I was stunned when after a full day of our wonderful trainer, Rich Carey, teaching us about the value of using the Japanese terms for helping teams grasp lean tools -- the founder of Definity Partners (and Definity University), Ray Attiyah, said, "better not for coffee." Ray Attiyah is the author of  the book Run, Improve, Grow and a self-proclaimed serial entrepreneur. I just know him as the brilliant person who has built a business helping manufacturers embrace lean culture, not just get a certificate. So when he said, "don't use the Japanese and lean terms like "Kaizen" and "Value Stream Mapping" he caught me off guard. "Instead, remind them what their pain is," he continued. "Why will lean help them?"

Ahhh... now I could understand. Talking about solutions that sound foreign will not help companies get comfortable with what you're offering. Talking about problems that are urgent -- like"declining productivity for the crop that earns 80% of your foreign exchange", or "potato taste defect that means you have to reject 20 containers a year." Those are good conversation-starters in the coffee world if we want to also talk about how to "achieve customer satisfaction through the most efficient use of resources." (The latter happens to be one of the definitions of lean I learned today.) As we learned at the beginning of the "day 1" class today -- "you have to remember the why -- why are we doing this?"

This blog, however, is for the brave souls who have read this far and still want to know -- "could lean work in coffee?"  So far the answer is a resounding "yes!"  In addition to a solid introduction to the concept and history of lean, Rich taught us Kaizen events and Value Stream Mapping. For each tool, the program incorporates a walk on the manufacturing floor of the "co-inhabitant" of the building, Upside. Upside manufacturers aluminum stairs and platforms. I love this! Instead of making paper planes or building towers with tinker toys, we are using an actual manufacturing environment as part of our classroom. Twice already we've walked through the plant, learning about processes that are new and strange to each of us. We try to "see with new eyes" and do the Gemba walk -- finding waste.

Then we learned how to draw the two key processes in any manufacturing setting: the production flow and the (reverse direction) information flow. These two "flow" process maps make up Value Stream Mapping (VSM). VSM helps everyone see the time spent on value-add (VA) processes vs. the non-value-add (NVA) processes.

What I liked best today -- the emphasis on involve and empower employees.